United Nations Directories
for Electronic Data Interchange for
Administration, Commerce and Transport



 UN/EDIFACT

Change indicators a plus sign (+) for an addition an asterisk (*) for an amendment to structure a hash sign (#) for changes to names a vertical bar (|) for changes to text for descriptions and notes a minus sign (-) for marked for deletion (within either batch and interactive messages) a X sign (X) for marked for deletion (within both batch and interactive messages)

4017 Delivery plan commitment level code [B]

Desc: Code specifying the level of commitment to a delivery plan. Repr: an..3 Code Values: 1 Firm Indicates that the scheduling information is a firm commitment. 2 Commitment for manufacturing and material Authorizes the supplier to start the manufacturing of goods. 3 Commitment for material Authorizes the manufacturer to order material required for manufacturing specified goods. | 4 Planning/forecast An estimate of future requirements based on trends and actual information. 5 Short delivered on previous delivery Part of a consignment which was not delivered when the original delivery was made. 6 Capacity available Capacity is available to meet the requested scheduling demands. | 9 User defined The user can interpret the meaning of the values from information exchanged previously. 10 Immediate Indicates that the scheduling information is for immediate execution. | 11 Pilot/Pre-volume Initial products required in advance of the normal production process. | 12 Planning An estimate of future requirements. | 13 Potential order increase The possibility and magnitude of a schedule fluctuation. | 14 Average plant usage The usual amount that a manufacturing facility will use over a specified duration. | 15 First time reported firm Initial confirmation of a material requirement. | 16 Maximum The highest attainable amount. | 17 Tooling capacity The maximum amount that the process was designed to accommodate. | 18 Normal tooling capacity The anticipated amount that the process was designed to accommodate over a specific period of time. | 19 Prototype The preliminary version of a product or service. | 20 Strike protection Product level that is set aside as protection in the event of a work stoppage. | 21 Required tooling capacity The contracted amount that the process was designed to accommodate over a specific period of time. 22 Deliver to schedule Deliver to schedule separately supplied. 23 Await manual pull Await non-EDI instruction before shipping. 24 Reference to commercial agreement between partners The buyer's commitment is the one defined in the commercial agreement. 26 Proposed Indicates that the scheduling information is a proposal.

Data Element Cross Reference

DataElement 4017 is used in the following Batch Segments:

SCC

Copyright 1995-2000 United Nations, all rights reserved
 
UN Economic Commission for Europe
Palais des Nations, CH-1211 Geneva 10, Switzerland
Tel: +41-22 917 2773 Fax: +41-22 917 0037 E-mail: TradeMaster@unece.org
 
UN/EDIFACT Directories