| United Nations Directories
 for Electronic Data Interchange for
 Administration, Commerce and Transport
 
 
   UN/EDIFACT
 | 
      Change indicators
        a plus sign (+)    for an addition
        an asterisk (*)    for an amendment to structure
        a hash sign (#)    for changes to names
        a vertical bar (|) for changes to text for descriptions and
                           notes
        a minus sign (-)   for marked for deletion (within either
                           batch and interactive messages)
        a X sign (X)       for marked for deletion (within both batch
                           and interactive messages)
     2009  Terms time relation code                                [B]
     Desc: Code relating terms to a reference date, time or
           period.
     Repr: an..3
     Code Values: 
     1     Reference date
              Payment terms related to reference date.
     2     Before reference
              Payment terms related to time before reference date.
     3     After reference
              Payment terms related to time after reference date.
     4     End of 10-day period containing the reference date
              Payment terms are at the end of the ten day period
              containing the reference date.
     5     End of 2-week period containing the reference date
              Payment terms are at the end of the two week period
              containing the reference date.
     6     End of month containing the reference date
              Payment terms are at the end of the month containing the
              reference date.
     7     End of the month following the month of reference date
              Payment terms are at the end of the month following the
              month of reference date.
     8     End of quarter containing the reference date
              Payment terms are at the end of the quarter containing
              the reference date.
     9     End of year containing the reference date
              Payment terms are at the end of the year containing the
              reference date.
     10    End of week containing the reference date
              Payment terms are at the end of the week containing the
              reference date.
     11    End of ten day period following month after reference
           date's month
              Payment terms are 10 days after the end of the
              referenced month.
     12    End of half year containing the reference date
              End of the half year in which the referred date falls.
     13    From reference
              Payment terms related to a time inclusive of and after a
              reference date.
     14    End of 15-day period containing the reference date
              Payment terms are at the end of the 15-day period
              containing the reference date.
     15    On or before reference
              Payment terms are on or before.
     16    Whichever is first, the 15th or last day of the month
           following the payment terms period
              The payment terms are at, whichever is first, the 15th
              or the last day of the month following the payment terms
              period (payment terms period = period of time between
              the reference date and the theoretical due date).
     17    After end of month containing the reference date
              Payment terms related to a time after the end of the
              month containing the reference date.
     Data Element Cross Reference
     DataElement 2009 is used in the following Batch Segments: 
     PYT
    
Copyright United Nations, all rights reserved 
  
  UN Economic Commission for Europe
 Palais des Nations, CH-1211 Geneva 10, Switzerland 
 Tel: +41-22 917 2773 Fax: +41-22 917 0037  E-mail: TradeMaster@unece.org
 
UN/EDIFACT Directories