United Nations Directories
for Electronic Data Interchange for
Administration, Commerce and Transport



 UN/EDIFACT

Change indicators a plus sign (+) for an addition an asterisk (*) for an amendment to structure a hash sign (#) for changes to names a vertical bar (|) for changes to text for descriptions and notes a minus sign (-) for marked for deletion (within either batch and interactive messages) a X sign (X) for marked for deletion (within both batch and interactive messages)

2005 Date or time or period function code qualifier [C]

Desc: Code qualifying the function of a date, time or period. Repr: an..3 Code Values: 1 Service completion date/time, actual Actual date/time on which the service was completed. 2 Delivery date/time, requested (2105) Date on which buyer requests goods to be delivered. 3 Invoice document issue date time [2377] Date of issue of an invoice. 4 Order document issue date time [2011] Date of order. 5 Saleable stock demand cover period, expected A period of time when saleable stocks are expected to cover demand for a product. 6 Moved from location date The date an entity moved from a location. 7 Effective from date/time (2069) Date and/or time at which specified event or document becomes effective. 8 Order received date/time Date/time when the purchase order is received by the seller. 9 Processing date/time Date/time of processing. 10 Shipment date/time, requested Date on which goods should be shipped or despatched by the supplier. 11 Despatch date and or time [2171] Date/time on which the goods are or are expected to be despatched or shipped. 12 Terms discount due date/time Date by which payment should be made if discount terms are to apply. 13 Terms net due date Date by which payment must be made. 14 Payment date/time, deferred Date/time when instalments are due. 15 Promotion start date/time Date/time when promotion activities begin. 16 Promotion end date/time Date/time when promotion activities end. 17 Delivery date/time, estimated (2109) Date and/or time when the shipper of the goods expects delivery will take place. 18 Installation date/time/period The date/time/period of the act, or an instance of installing something or someone. 19 Meat ageing period Period of time between slaughter and delivery during which meat is ageing. 20 Cheque date/time Date/time when cheque is issued. 21 Charge back date/time The date/time of the charge back. 22 Freight bill date/time Date/time when freight bill is issued. 23 Equipment reconditioning date/time, actual Actual date/time of the reconditioning of a piece of equipment. 24 Transfer note acceptance date and time Date and time when a transfer note (transfer document for transport exclusively using containers as equipment) is recognised as being valid by the carrier. 35 Delivery date/time, actual Date/time on which goods or consignment are delivered at their destination. 36 Expiry date Date of expiry of the validity of a referenced document, price information or any other referenced data element with a limited validity period. 37 Ship not before date/time Goods should not be shipped before given date/time. 38 Ship not later than date/time Date/time by which the goods should have been shipped. 39 Ship week of date Date identifying the week during which goods should be shipped. 40 Clinical information issue date and/or time Date and/or time when clinical information is issued. 41 Event duration, expected The expected duration of an event. 42 Superseded date/time Date/time being overlaid by a date given elsewhere. 43 Event duration, intended The intended duration of an event. 44 Availability Date/time when received item is available. 45 Compilation date and time Date and time of the compilation. 46 Cancellation date [2095] Date on which a document or message has been cancelled. 47 Statistical time series date Date for statistical time series purposes. 48 Duration Duration. 49 Deliver not before and not after dates Deliver not before and not after a specific date range. 50 Goods receipt date/time Date/time upon which the goods were received by a given party. 51 Cumulative quantity start date First Date for accumulation of delivery quantities. 52 Cumulative quantity end date Last Date for accumulation of delivery quantities. 53 Buyer's local time Time at the buyer's location. 54 Seller's local time Time at the seller's location. 55 Confirmed date/time Date/time which has been confirmed. 56 Original authorisation date and/or time Date and/or time when original authorisation was issued. 57 Precaution relevant period The period when a precaution is relevant. 58 Clearance date (Customs) Date on which Customs formalities necessary to allow goods to be exported, to enter home use, or to be placed under another Customs procedure has been accomplished (CCC). 59 Inbound movement authorization date Inland movement authorization date. 60 Engineering change level date Date the engineering level of goods is changed. 61 Cancel if not delivered by this date The date on which cancellation should take place, if delivery has not occurred. 62 Excluded date Date excluded from a period of time. 63 Delivery date time, last [2025] Last date, and optionally time of a delivery. 64 Delivery date/time, earliest [2091] Date identifying a point in time before which the goods shall not be delivered. 65 Delivery date/time, 1st schedule The first scheduled date/time for delivery. 66 Excluded period An interval of time excluded from a period of time. 67 Delivery date/time, current schedule Delivery Date deriving from actual schedule. 68 Additional period An interval of time added to a period of time. 69 Delivery date time, promised before [2139] Date and optionally time by which the merchandise should be delivered to the buyer, as agreed between the seller and the buyer (generic term). 70 Additional date Date added to a period of time. 71 Delivery date/time, requested for (after and including) Delivery is requested to happen after or on given date. 72 Delivery date/time, promised for (after and including) Delivery might take place earliest at given date. 73 Guarantee period The period for which the guarantee is or will be granted. 74 Delivery date/time, requested for (prior to and including) Delivery is requested to happen prior to or including the given date. 75 Delivery date/time, promised for (prior to and including) Delivery might take place latest at given date. 76 Delivery date/time, scheduled for The date/time for which delivery is scheduled. 77 Specification revision date Date of revision to a specification. 78 Event date/time/period, actual [2193] The actual date/time/period an event occurred. 79 Shipment date/time, promised for Shipment might happen at given date/time. 80 Planning end date and/or time, actual The actual date and/or time the planning ended. 81 Shipment date/time, requested for (after and including) Shipment should happen earliest at given date. 82 Medicine administration time Designated time of day for the administration of medicine. 83 Dispensing interval, minimum The shortest interval allowed between one dispensing of an item and the next dispensing of the same item. 84 Shipment date/time, requested for (prior to and including) Shipment should take place latest at given date. 85 Shipment date/time, promised for (prior to and including) Shipment might take place latest at given date. 86 Medication date/time, start Date and/or time when medication was started. 87 Travel service connection time Time elapsing between the arrival of a travel service and the departure of a connecting travel service. 88 Summer time, start Date/time at which the summer time starts. 89 Inquiry date The date on which an inquiry is made. 90 Report start date The date on which a report is to begin. 91 Report end date The date on which a report is to end. 92 Contract effective date Date when a contract becomes valid. 93 Contract expiry date Date when a contract expires. 94 Production/manufacture date Date on which goods are produced. 95 Bill of lading date Date as specified on the bill of lading. 96 Discharge date/time Date/time when goods should, might or have been discharged from the means of transport. 97 Transaction creation date The date on which a transaction was originated or brought into being. 98 Winter time, start Date/time at which the winter time starts. 99 Quotation opening date The date on which the quotation has been or may be opened. 100 Product ageing period before delivery Period of time before delivery during which the product is ageing. 101 Production date, no schedule established as of Date as of there is no valid production schedule. 102 Health problem period Period of time of health problem. 103 Closing date/time for breakbulk STORO Date/time on which delivering period for breakbulk STORO cargo ends (STORO = Stowing on Roll on-Roll off vessel). 104 Closing date/time for container RO-RO Date/time on which delivering period for container Roll on-Roll off (RO-RO) cargo ends. 105 Starting date/time for breakbulk STORO Date/time on which delivering period for breakbulk STORO cargo starts (STORO = Stowing on Roll on-Roll off vessel). 106 Starting date/time for container RO-RO Date/time on which delivering period for container Roll on-Roll off (RO-RO) carg