United Nations Directories for Electronic Data Interchange for
Administration, Commerce and Transport
UN/EDIFACT
|
Change indicators
a plus sign (+) for an addition
an asterisk (*) for an amendment to structure
a hash sign (#) for changes to names
a vertical bar (|) for changes to text for descriptions and
notes
a minus sign (-) for marked for deletion (within either
batch and interactive messages)
a X sign (X) for marked for deletion (within both batch
and interactive messages)
5249 Percentage basis identification code [B]
Desc: Code specifying the basis on which a percentage is
calculated.
Repr: an..3
Code Values:
1 Per unit
Referenced percentage applies on a single unit basis.
2 Per ton
Reduction percentage is applied per transported ton.
3 Per equipment unit
Reduction percentage is applied per main equipment unit
(for rail purpose, only rail wagons).
4 Per unit price
Reduction percentage is applied on the unit price, which
is the basis of the charge calculation.
5 Per quantity
Reduction percentage applied on the unit price and
conceded to a consignor after he reached a specified
tonnage of transport.
6 Basic charge
Code to indicate that the IATA experimental special
charge within Europe is the basis for the percentage
reduction or surcharge.
7 Rate per kilogram
Code to indicate that the IATA experimental special rate
within in Europe is the basis for the percentage
reduction or surcharge.
8 Minimum charge
Code to indicate that the IATA minimum charge is the
basis for the percentage reduction or surcharge.
9 Normal rate
Code to indicate that the IATA normal rate is the basis
for the percentage reduction or surcharge.
10 Quantity rate
Code to indicate that the IATA quantity rate is the
basis for the percentage reduction or surcharge.
11 Amount of drawing
Referenced percentage applies on the amount of drawing
under the documentary credit.
12 Documentary credit amount
Referenced percentage applies on documentary credit
amount.
13 Invoice value
Referenced percentage applies on the invoice value.
14 CIF value
Referenced percentage applies on CIF value.
15 Contract cost
The percentage applied to the contract cost.
16 Labour hours
The percentage applied to the labour hours.
17 LIBOR (London Inter-Bank Offered Rate)
The percentage basis is London Inter-Bank Offered Rate
(LIBOR).
18 FIBOR (Frankfurt Inter-Bank Offered Rate)
The percentage basis is Frankfurt Inter-Bank Offered
Rate (FIBOR).
19 PIBOR (Paris Inter-Bank Offered Rate)
The percentage basis is Paris Inter-Bank Offered Rate
(PIBOR).
20 Nationally based percentage basis
The percentage basis is nationally based.
Data Element Cross Reference
DataElement 5249 is used in the following Batch Composite Elements:
C501
Copyright United Nations, all rights reserved
UN Economic Commission for Europe
Palais des Nations, CH-1211 Geneva 10, Switzerland
Tel: +41-22 917 1366 Fax: +41-22 917 0037 E-mail: [email protected]
UN/EDIFACT Directories