United Nations Directories
for Electronic Data Interchange for
Administration, Commerce and Transport



 UN/EDIFACT

Change indicators a plus sign (+) for an addition an asterisk (*) for an amendment to structure a hash sign (#) for changes to names a vertical bar (|) for changes to text for descriptions and notes a minus sign (-) for marked for deletion (within either batch and interactive messages) a X sign (X) for marked for deletion (within both batch and interactive messages)

8457 Excess transportation reason code [B]

Desc: Code specifying the reason for excess transportation. Repr: an..3 Code Values: A Special rail car order, schedule increase forecast change The reason for the excess transportation is due to special rail car order, schedule increase forecast change. B Engineering change or late release The reason for the excess transportation is due to engineering change or late release. C Specification (schedule) error/overbuilding The reason for the excess transportation is due to special rail car order, schedule increase forecast change specification (schedule) error/overbuilding. D Shipment tracing delay The reason for the excess transportation is due to shipment tracing delay. E Plant inventory loss The reason for the excess transportation is due to plant inventory loss. F Building ahead of schedule The reason for the excess transportation is due to building ahead of schedule. G Vendor behind schedule The reason for the excess transportation is due to vendor behind schedule. H Failed to include in last shipment The reason for the excess transportation is due to failure to include costs in last shipment. I Carrier loss claim The reason for the excess transportation is due to carrier loss claim. J Transportation failure The reason for the excess transportation is due to transportation failure. K Insufficient weight for carload The reason for the excess transportation is due to insufficient weight for carload. L Reject or discrepancy (material rejected in prior shipment) The reason for the excess transportation is due to reject or discrepancy. M Transportation delay The reason for the excess transportation is due to transportation delay. N Lack of railcar or railroad equipment The reason for the excess transportation is due to lack of railcar of railroad equipment. P Releasing error The reason for the excess transportation is due to releasing error. R Record error or cate reported discrepancy report The reason for the excess transportation is due to record error or cate reported discrepancy report. T Common or peculiar part schedule increase The reason for the excess transportation is due to common or peculiar part schedule increase. U Alternative supplier shipping for responsible supplier The reason for the excess transportation is due to alternative supplier shipping for responsible supplier. V Direct schedule or locally controlled The reason for the excess transportation is due to direct schedule or locally controlled. W Purchasing waiver approval The reason for the excess transportation is due to purchasing waiver approved. X Authorization code to be determined The reason for the excess transportation is due to authorization code to be determined. Y Pilot material The reason for the excess transportation is due to pilot material. ZZZ Mutually defined A code assigned within a code list to be used on an interim basis and as defined among trading partners until a precise code can be assigned to the code list.

Data Element Cross Reference

DataElement 8457 is used in the following Batch Composite Elements:

C401

Copyright United Nations, all rights reserved
 
UN Economic Commission for Europe
Palais des Nations, CH-1211 Geneva 10, Switzerland
Tel: +41-22 917 1366 Fax: +41-22 917 0037 E-mail: TradeMaster@unece.org
 
UN/EDIFACT Directories