|
|
|
|
|
|
|
|
|
|
|
|
|
Minimum freight Bill of Lading |
|
|
|
|
Minimum ocean freight supplement |
|
|
|
|
Minimum freight LCL cargo |
|
|
|
|
Minimum freight FCL cargo |
|
|
|
|
Supplement to minimum FCL freight |
|
|
|
|
FCL minimum revenue shortfall |
|
|
|
|
|
|
Excess freight over FCL minimum |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FCL maximum all measurement |
|
|
|
|
FCL maximum multi rate measurement |
|
|
|
|
FCL maximum mixed weight measure |
|
|
|
|
|
|
All-in Ocean Freight (10) |
|
|
|
|
Basic price according to transport tariff (30) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Special freight supplement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Special cargo freight additional |
|
|
|
|
|
|
Inland freight destination |
|
|
|
|
|
|
|
|
|
|
Change of destination fee |
|
|
|
|
|
|
|
|
|
|
|
|
Extra to reach consolidated container minimum |
|
|
|
|
|
|
|
|
|
|
|
|
Compensation for deck cargo |
|
|
|
|
Compensation for tarpaulins |
|
|
|
|
Extra for separation in different holds |
|
|
|
|
Lying idle and/or sailing - followed by sailing |
|
|
|
|
Lying idle and/or sailing - if not followed by sailing |
|
|
|
|
Cost of transportation (sea, inland waterways, or air freight, or overland carriage) |
|
|
|
|
Transport - rail, road, water |
|
|
|
|
Road transport, delivery to free house, including any urban area congestion surcharge |
|
|
|
|
Collection ex house, movement including any urban area transport congestion surcharge |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Discount - special project |
|
|
|
|
Discount - high commission |
|
|
|
|
|
|
|
|
Discount - chemical contract |
|
|
|
|
|
|
|
|
Discount - accumulated FCL |
|
|
|
|
Discount - on heavy lift additional |
|
|
|
|
Discount - on extra length additional |
|
|
|
|
Discount - on over height additional |
|
|
|
|
Discount - on over width additional |
|
|
|
|
Discount - on out of gauge additional |
|
|
|
|
|
|
|
|
|
|
|
|
Discount - special heavy lift |
|
|
|
|
|
|
|
|
|
|
Forwarding Agents' Commission |
|
|
|
|
Forwarding commission (FF) |
|
|
|
|
Forwarding Agents' Commission - Deferred |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rebate - special immediate |
|
|
|
|
|
|
|
|
Rebate - special deferred |
|
|
|
|
|
|
Rebate - special commodity |
|
|
|
|
|
|
|
|
Rebate - conference project |
|
|
|
|
|
|
Rebate - direct on oncarrying freight |
|
|
|
|
Rebate - direct on seafreight |
|
|
|
|
|
|
Rebate - direct on collect seafreight |
|
|
|
|
|
|
Rebate - minimum pallet/unit/skid |
|
|
|
|
|
|
|
|
FREIGHT CHARGE ADJUSTMENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Currency adjustment rebate |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Currency devaluation surcharge |
|
|
|
|
|
|
|
|
|
|
Freight surcharge (sea or inland waterways) |
|
|
|
|
|
|
FREIGHT CHARGES ADDITIONAL |
|
|
|
|
|
|
|
|
|
|
|
|
Transhipment heavy lift additional |
|
|
|
|
|
|
|
|
|
|
|
|
Compensation inland freight |
|
|
|
|
|
|
Destination port additional |
|
|
|
|
|
|
|
|
|
|
Transhipment or transfer (charge for) |
|
|
|
|
Container usage charge (DD) |
|
|
|
|
Container utilization charge |
|
|
|
|
Use of container (charge for) (20) |
|
|
|
|
|
|
Equipment transfer charge origin |
|
|
|
|
|
|
Equipment transfer charge destination |
|
|
|
|
|
|
|
|
Additional dunnaging charge |
|
|
|
|
|
|
Equipment detention charge |
|
|
|
|
|
|
|
|
Warlike operations additional |
|
|
|
|
|
|
|
|
|
|
|
|
East Mediterranean surcharge |
|
|
|
|
|
|
Other supplementary charges not specified |
|
|
|
|
|
|
|
|
LCL service charge origin |
|
|
|
|
Direct outport additional |
|
|
|
|
|
|
|
|
|
|
|
|
LCL service charge destination |
|
|
|
|
|
|
|
|
Additional for extra loading/discharging sites (incl. Axle changing) |
|
|
|
|
Additional for extra sailing/detention cost |
|
|
|
|
Additional for loading/unloading at special places |
|
|
|
|
|
|
Additional for waterways with limited draught |
|
|
|
|
Additional on weight for special goods |
|
|
|
|
Additional on tariff for special goods |
|
|
|
|
Additional on weight for voluminous goods |
|
|
|
|
Additional per WT for dangerous goods: extra work |
|
|
|
|
Additional for vermin, stench, dirt |
|
|
|
|
Additional for extra labour due to type of goods |
|
|
|
|
Compensation for willingness to sail in overtime |
|
|
|
|
Compensation for actual sailing in overtime |
|
|
|
|
|
|
|
|
|
|
Ferry-boat crossing or maritime crossing (charge for) (20) |
|
|
|
|
|
|
Arbitrary charge/differential |
|
|
|
|
|
|
|
|
Break of journey (charge for) |
|
|
|
|
|
|
|
|
Canadian terminal service charge |
|
|
|
|
Canal charges, tolls, etc. |
|
|
|
|
|
|
Change of delivery status charge |
|
|
|
|
|
|
Chilean mercantile marine tax |
|
|
|
|
Collection fee seafreight |
|
|
|
|
|
|
|
|
Customs clearance charges |
|
|
|
|
|
|
|
|
|
|
Stabling or Demurrage of Wagons (charge for) |
|
|
|
|
Demurrage and/or standage charges for vehicles (lorries or rail trucks) or containers |
|
|
|
|
Destination depot service charge |
|
|
|
|
|
|
Destination port service charge |
|
|
|
|
|
|
|
|
|
|
|
|
Special equipment charge (10) |
|
|
|
|
Use of loading tackle (charge for) (20) |
|
|
|
|
|
|
Forwarding (from/to) (FF) |
|
|
|
|
Forwarding at origin or destination (10) |
|
|
|
|
|
|
|
|
Optional destination fee (10) |
|
|
|
|
|
|
|
|
Fumigation (due to vermin in cargo)(80) |
|
|
|
|
|
|
General Average (consignor's appointment) |
|
|
|
|
|
|
|
|
|
|
Use of pallets (charge for) (20) |
|
|
|
|
Use of sheet (charge for) (20) |
|
|
|
|
|
|
|
|
|
|
LCL and breakbulk service charge |
|
|
|
|
|
|
|
|
|
|
|
|
Meat transit storage levy |
|
|
|
|
|
|
|
|
|
|
|
|
Other costs not specified (20) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Port liner terminal charges |
|
|
|
|
|
|
|
|
|
|
Renumeration for shippers' owned equipment |
|
|
|
|
Ro-Ro terminal handling charge |
|
|
|
|
|
|
|
|
Specific commodity charge |
|
|
|
|
Specific port/country additional |
|
|
|
|
St.Lawrence Seaway charges |
|
|
|
|
Subagent commission france |
|
|
|
|
|
|
|
|
|
|
Transfercharge for heavy articles |
|
|
|
|
|
|
|
|
|
|
|
|
Transportcharges free domicile cleared |
|
|
|
|
Transportcharges free domicile uncleared |
|
|
|
|
Transportcharges to border |
|
|
|
|
Transportcharges to depot |
|
|
|
|
Uncontainerized port charge |
|
|
|
|
|
|
Vanning and dumping charge |
|
|
|
|
|
|
|
|
|
|
Costs for crossing the channel tunnel |
|
|
|
|
Transport between terminals |
|
|
|
|
Transport charges from depot |
|
|
|
|
|
|
Transhipment charge precarriage |
|
|
|
|
|
|
Unspecified freight additional precarriage sea |
|
|
|
|
Pre-Carriage haulage charges |
|
|
|
|
|
|
|
|
|
|
Pre-Carriage fuel surcharge |
|
|
|
|
|
|
|
|
|
|
Pre-Shipment charge - wool |
|
|
|
|
|
|
|
|
Origin zone transport charge |
|
|
|
|
Handover charge pre-carriage |
|
|
|
|
|
|
|
|
Transhipment charge - oncarriage |
|
|
|
|
|
|
Unspecified freight additional oncarriage sea |
|
|
|
|
On-Carriage haulage charge |
|
|
|
|
|
|
|
|
|
|
On-Carriage fuel surcharge |
|
|
|
|
|
|
|
|
|
|
|
|
LCL wool unpacking charge |
|
|
|
|
Destination zone transport charge |
|
|
|
|
Delivery and zone charge wool |
|
|
|
|
Handover charge on-carriage |
|
|
|
|
|
|
DANGEROUS GOODS ADDITIONAL CHARGES |
|
|
|
|
Dangerous goods additional |
|
|
|
|
|
|
Safety person (dangerous goods) |
|
|
|
|
SPECIAL TRANSPORT ADDITIONAL CHARGES |
|
|
|
|
|
|
Special container additional |
|
|
|
|
Charge for use of special wagon, for example well-wagon |
|
|
|
|
Cost of carriage by special train |
|
|
|
|
Charge for use of trucks/carrying bogies |
|
|
|
|
Charge for out of-gauge consignments |
|
|
|
|
HEATING ADDITIONAL CHARGES |
|
|
|
|
Container heating additional |
|
|
|
|
COOLING ADDITIONAL CHARGES |
|
|
|
|
Reeferconnection electric - cont/days export |
|
|
|
|
Reeferconnection electric - cont/days import |
|
|
|
|
Insulated container days between first/last day export |
|
|
|
|
Insulated container days between first/last day import |
|
|
|
|
Insulated container first/last day export |
|
|
|
|
Insulated container first/last day import |
|
|
|
|
Mechanically refrigerated wagon charge |
|
|
|
|
Interfrigo mechanically-refrigerated wagon charge |
|
|
|
|
Reeferconnection electric - first or last day export |
|
|
|
|
Reeferconnection electric - first or last day import |
|
|
|
|
Reeferconnection electric for shifted containers |
|
|
|
|
|
|
All goods handling charges |
|
|
|
|
HANDLING EQUIPMENT HIRE CHARGES |
|
|
|
|
|
|
|
|
|
|
|
|
Use of 02.5 ton forktruck |
|
|
|
|
|
|
|
|
|
|
Use of 20 feet terminal chassis |
|
|
|
|
Use of 40 feet terminal chassis |
|
|
|
|
|
|
|
|
Use of 45 feet terminal chassis |
|
|
|
|
|
|
Loading 20 feet containers full DS/SS |
|
|
|
|
Loading 30 feet containers full DS/SS |
|
|
|
|
Loading 35 feet containers full DS/SS |
|
|
|
|
Loading 40 feet containers full DS/SS |
|
|
|
|
Loading 20 feet container empty DS/SS |
|
|
|
|
Loading 30 feet container empty DS/SS |
|
|
|
|
Loading 35 feet container empty DS/SS |
|
|
|
|
Loading 40 feet container empty DS/SS |
|
|
|
|
Loading bundles containers DS/SS |
|
|
|
|
Loading containers with chains DS/SS |
|
|
|
|
Loading containers on time-basis DS/SS |
|
|
|
|
Loading 20 feet container full on feeders |
|
|
|
|
Loading 30 feet container full on feeders |
|
|
|
|
Loading 35 feet container full on feeders |
|
|
|
|
Loading 40 feet container full on feeders |
|
|
|
|
Loading 20 feet container empty on feeders |
|
|
|
|
Loading 30 feet container empty on feeders |
|
|
|
|
Loading 35 feet container empty on feeders |
|
|
|
|
Loading 40 feet container empty on feeders |
|
|
|
|
Loading bundles containers on feeders |
|
|
|
|
Loading containers with chains on feeders |
|
|
|
|
Loading containers on time-basis on feeders |
|
|
|
|
Loading 20 feet container into barge full |
|
|
|
|
Loading 30 feet container into barge full |
|
|
|
|
Loading 35 feet container into barge full |
|
|
|
|
Loading 40 feet container into barge full |
|
|
|
|
Loading 20 feet container into barge empty |
|
|
|
|
Loading 30 feet container into barge empty |
|
|
|
|
Loading 35 feet container into barge empty |
|
|
|
|
Loading 40 feet container into barge empty |
|
|
|
|
Loading container with chains into barge |
|
|
|
|
Loading palletized cargo up to and including 3 cbm per 1000 kg |
|
|
|
|
Loading palletized cargo - increase for exceeding 3 cbm per 1000 kg |
|
|
|
|
Loading big bags of at least 1000 kg, provided with hoisting loops |
|
|
|
|
Loading linerboard on reels of min. 1500 kg per reel |
|
|
|
|
Loading blooms up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading slabs up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading billets up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading coils up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading strips and hoops up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading plates (also corrugated) up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading tinplates and sheets up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Loading tubes, pipes of min. 500 kg, up to/incl. 3000 kg per piece/bundle |
|
|
|
|
Loading tubes, pipes of min. 500 kg, and over 3000 kg per piece/bundle |
|
|
|
|
Loading normal structural- and merchant steel up to/incl. 12 metres length |
|
|
|
|
Loading other iron and steel of min. 500 kg per piece/bundle |
|
|
|
|
|
|
Loading normal structural- and merchant steel over 12 metres length |
|
|
|
|
Loading blooms over 5000 kg per piece/bundle |
|
|
|
|
Loading slabs over 5000 kg per piece/bundle |
|
|
|
|
Loading billets over 5000 kg per piece/bundle |
|
|
|
|
Loading coils over 5000 kg per piece/bundle |
|
|
|
|
Loading strips and hoops over 5000 kg per piece/bundle |
|
|
|
|
Loading plates (also corrugated) over 5000 kg per piece/bundle |
|
|
|
|
Loading tinplates and sheets over 5000 kg per piece/bundle |
|
|
|
|
Loading non ferrous metals loose or in bundles or in units |
|
|
|
|
Loading ingots of min. 25 kg each |
|
|
|
|
Loading blocks of min. 25 kg each |
|
|
|
|
Loading plates of min. 25 kg each |
|
|
|
|
Loading bars of min. 25 kg each |
|
|
|
|
Loading slabs of min. 25 kg each |
|
|
|
|
Loading units of min. 950 kg |
|
|
|
|
Loading bundles of min. 950 kg |
|
|
|
|
Loading blocks of min. 950 kg |
|
|
|
|
Loading onions palletized, up to/incl. 750 kg per pallet or in bins of min. 400 kg |
|
|
|
|
Loading onions palletized, over 750 kg per pallet |
|
|
|
|
Loading garlic palletized, up to/incl. 750 kg per pallet or in bins of min. 400 kg |
|
|
|
|
Loading garlic palletized, over 750 kg per pallet |
|
|
|
|
Loading potatoes palletized, up to/incl. 750 kg per pallet or in bins of min. 400 kg |
|
|
|
|
Loading potatoes palletized, over 750 kg per pallet |
|
|
|
|
Loading fresh fruits in crates, bags over 15 kg up to/incl. 45 kg per package |
|
|
|
|
Loading other agricultural products in crates, bags, etc. over 45 kg per package |
|
|
|
|
Loading cooled and refrig. cargo up to/incl. 20 kg per package |
|
|
|
|
Loading cooled and refrig. cargo over 20 kg per package |
|
|
|
|
Loading cooled and refrig. cargo, palletized |
|
|
|
|
Loading bagged cargo in bags of min. 40 kg - parcels up to/incl 250 tons |
|
|
|
|
Loading bagged cargo in bags of min. 40 kg - parcels over 250 tons or paying for 250 tons |
|
|
|
|
Loading drums and barrels of min. 160 kg to be handled with chimbhooks |
|
|
|
|
Loading drums and barrels of min. 160 kg, to be handled without chimbhooks or limited hoist size due to IMO |
|
|
|
|
Loading general cargo measuring up to/incl. 3 cbm per 1000 kg |
|
|
|
|
Loading general cargo measuring up to/incl. 3 cbm per 1000 kg, delivered on shipper's pallets to be broken down during loading and to be redelivered to shore |
|
|
|
|
Loading general cargo - extra for measuring over 3 cbm per 1000 kg |
|
|
|
|
Loading general cargo, delivered on shipper's pallets to be broken down during loading and to be broken down during loading and to be redelivered to shore |
|
|
|
|
Loading motorcars or other rolling stock unpacked with tyres or tracks, up to/incl. 5 tons per piece |
|
|
|
|
Loading motorcars or other rolling stock unpacked with tyres or tracks, over 5 tons but up to/incl. 17.5 tons per piece |
|
|
|
|
Loading motorcars or other rolling stock unpacked with tyres or tracks, over 17.5 tons per piece |
|
|
|
|
Loading containers/flats up to/incl. 50 pieces per call |
|
|
|
|
Loading containers/flats over 50 pieces per call |
|
|
|
|
Loading containers DeepSea/ShortSea in overtime |
|
|
|
|
Loading containers with chains DeepSea/ShortSea in overtime |
|
|
|
|
Loading adaptors in overtime |
|
|
|
|
Loading palletized cargo in overtime |
|
|
|
|
Loading unpacked lifts in overtime |
|
|
|
|
Loading uncontainerized cargo in overtime |
|
|
|
|
Loading containers feeders in overtime |
|
|
|
|
Loading containers with chains feeders in overtime |
|
|
|
|
Loading chassis in overtime |
|
|
|
|
Loading breakbulk (1 ton to 7 ton) ro-ro in overtime |
|
|
|
|
Loading breakbulk (<1 ton) ro-ro in overtime |
|
|
|
|
Loading cars (not selfdriven) ro-ro |
|
|
|
|
Loading cars (not selfdriven) ro-ro in overtime |
|
|
|
|
Loading cars (selfdriven) ro-ro |
|
|
|
|
Loading cars (selfdriven) ro-ro in overtime |
|
|
|
|
Loading containers on wheels ro-ro |
|
|
|
|
Loading containers on wheels ro-ro in overtime |
|
|
|
|
Loading general cargo (1 ton to 7 tons) ro-ro |
|
|
|
|
Loading general cargo (<1 ton) ro-ro |
|
|
|
|
Loading logs (bundled) ro-ro |
|
|
|
|
Loading logs (bundled) ro-ro in overtime |
|
|
|
|
Loading logs (loose) ro-ro |
|
|
|
|
Loading logs (loose) ro-ro in overtime |
|
|
|
|
Loading special units ro-ro |
|
|
|
|
Loading special units ro-ro in overtime |
|
|
|
|
Loading tractors (not selfdriven) ro-ro |
|
|
|
|
Loading tractors (not selfdriven) ro-ro in overtime |
|
|
|
|
Loading tractors (selfdriven) ro-ro |
|
|
|
|
Loading tractors (selfdriven) ro-ro in overtime |
|
|
|
|
|
|
Loading trailers ro-ro in overtime |
|
|
|
|
Loading trucks (not selfdriven) ro-ro |
|
|
|
|
Loading trucks (not selfdriven) ro-ro in overtime |
|
|
|
|
Loading trucks (selfdriven) ro-ro |
|
|
|
|
Loading trucks (selfdriven) ro-ro in overtime |
|
|
|
|
Loading units on wheels (selfdriven) ro-ro |
|
|
|
|
Loading units on wheels (selfdriven) ro-ro in overtime |
|
|
|
|
|
|
Loading into containers (FF) |
|
|
|
|
|
|
|
|
Loading, unloading or adjustment of load (charge for) (20) |
|
|
|
|
Loading/Offloading/Unsheeting/Stripping/Stuffing (FF) |
|
|
|
|
Loading/Unloading charges |
|
|
|
|
Loading 20 feet container full with overheight/overwide on feeders |
|
|
|
|
Loading 20 feet container full dangerous goods on feeders |
|
|
|
|
Loading 40 feet container full with overheight/overwide on feeders |
|
|
|
|
Loading 40 feet container full dangerous goods on feeders |
|
|
|
|
Loading 20 feet container full with overheight/overwide into barge |
|
|
|
|
Loading 20 feet container into barge full - additional charges |
|
|
|
|
Loading 40 feet container full with overheight/overwide into barge |
|
|
|
|
Loading 40 feet container into barge full - additional charges |
|
|
|
|
Loading 20 feet container empty into barge - additional charges |
|
|
|
|
Loading 40 feet container empty into barge - additional charges |
|
|
|
|
Loading/Unloading charges of over X times cargo measurement |
|
|
|
|
Loading/Unloading dues - sea transit |
|
|
|
|
Loading 20 feet containers full DS/SS with dangerous goods |
|
|
|
|
Loading 20 feet containers full DS/SS with overheight/overwide |
|
|
|
|
Loading 20 feet containers full DS/SS with flats/platform |
|
|
|
|
Loading 20 feet containers full DS/SS main vessel to main vessel |
|
|
|
|
Loading 40 feet containers full DS/SS with dangerous goods |
|
|
|
|
Loading 40 feet containers full DS/SS with overheight/overwide |
|
|
|
|
Loading 40 feet containers full DS/SS with flats/platform |
|
|
|
|
Loading 40 feet containers full DS/SS main vessel to main vessel |
|
|
|
|
Loading 45 feet containers full DS/SS |
|
|
|
|
Loading 45 feet container empty DS/SS |
|
|
|
|
Loading 45 feet container full on feeders |
|
|
|
|
Loading 45 feet container empty on feeders |
|
|
|
|
Loading 45 feet container into barge full |
|
|
|
|
Loading 45 feet container into barge empty |
|
|
|
|
Loading 45 feet container full with overheight/overwide on feeders |
|
|
|
|
Loading 45 feet container full dangerous goods on feeders |
|
|
|
|
Loading 45 feet container full with overheight/overwide into barge |
|
|
|
|
Loading 45 feet container into barge full - additional charges |
|
|
|
|
Loading 45 feet container empty into barge - additional charges |
|
|
|
|
Loading 45 feet containers full DS/SS with dangerous goods |
|
|
|
|
Loading 45 feet containers full DS/SS with overheight/overwide |
|
|
|
|
Loading 45 feet containers full DS/SS with flats/platform |
|
|
|
|
Loading 45 feet containers full DS/SS main vessel to main vessel |
|
|
|
|
Loading uncontainerized cargo |
|
|
|
|
Loading uncontainerized cargo in overtime |
|
|
|
|
Loading 20 feet containers full feeder vessel to main vessel |
|
|
|
|
Loading 40 feet containers full feeder vessel to main vessel |
|
|
|
|
Loading 45 feet containers full feeder vessel to main vessel |
|
|
|
|
Loading 20 feet containers empty DS/SS main vessel to main vessel |
|
|
|
|
Loading 40 feet containers empty DS/SS main vessel to main vessel |
|
|
|
|
Loading 45 feet containers empty DS/SS main vessel to main vessel |
|
|
|
|
Loading 20 feet containers empty feeder vessel to main vessel |
|
|
|
|
Loading 40 feet containers empty feeder vessel to main vessel |
|
|
|
|
Loading 45 feet containers empty feeder vessel to main vessel |
|
|
|
|
Loading 20 feet containers full DS/SS main vessel to main vessel in overtime |
|
|
|
|
Loading 40 feet containers full DS/SS main vessel to main vessel in overtime |
|
|
|
|
Loading 45 feet containers full DS/SS main vessel to main vessel in overtime |
|
|
|
|
Loading 20 feet containers full feeder vessel to main vessel in overtime |
|
|
|
|
Loading 40 feet containers full feeder vessel to main vessel in overtime |
|
|
|
|
Loading 45 feet containers full feeder vessel to main vessel in overtime |
|
|
|
|
Loading 20 feet containers empty DS/SS main vessel to main vessel in overtime |
|
|
|
|
Loading 40 feet containers empty DS/SS main vessel to main vessel in overtime |
|
|
|
|
Loading 45 feet containers empty DS/SS main vessel to main vessel in overtime |
|
|
|
|
Loading 20 feet containers empty feeder vessel to main vessel in overtime |
|
|
|
|
Loading 40 feet containers empty feeder vessel to main vessel in overtime |
|
|
|
|
Loading 45 feet containers empty feeder vessel to main vessel in overtime |
|
|
|
|
Loading containers main vessel to main vessel with dangerous goods |
|
|
|
|
Loading containers main vessel to main vessel with overheight/overwidth in overtime |
|
|
|
|
Loading containers main vessel to main vessel with dangerous goods in overtime |
|
|
|
|
Loading containers main vessel to main vessel with overheight/overwidth in overtime |
|
|
|
|
|
|
Discharging 20 feet container full DS/SS |
|
|
|
|
Discharging 30 feet container full DS/SS |
|
|
|
|
Discharging 35 feet container full DS/SS |
|
|
|
|
Discharging 40 feet container full DS/SS |
|
|
|
|
Discharging 20 feet container empty DS/SS |
|
|
|
|
Discharging 30 feet container empty DS/SS |
|
|
|
|
Discharging 35 feet container empty DS/SS |
|
|
|
|
Discharging 40 feet container empty DS/SS |
|
|
|
|
Discharging bundles containers DS/SS |
|
|
|
|
Discharging containers with chains DS/SS |
|
|
|
|
Discharging containers on time-basis DS/SS |
|
|
|
|
Discharging 20 feet containers full ex feeders |
|
|
|
|
Discharging 30 feet containers full ex feeders |
|
|
|
|
Discharging 35 feet containers full ex feeders |
|
|
|
|
Discharging 40 feet containers full ex feeders |
|
|
|
|
Discharging 20 feet container empty ex feeders |
|
|
|
|
Discharging 30 feet container empty ex feeders |
|
|
|
|
Discharging 35 feet container empty ex feeders |
|
|
|
|
Discharging 40 feet container empty ex feeders |
|
|
|
|
Discharging bundles containers ex feeders |
|
|
|
|
Discharging containers with chains ex feeders |
|
|
|
|
Discharging containers on time-bases ex feeders |
|
|
|
|
Discharging 20 feet container ex barge full |
|
|
|
|
Discharging 30 feet container ex barge full |
|
|
|
|
Discharging 35 feet container ex barge full |
|
|
|
|
Discharging 40 feet container ex barge full |
|
|
|
|
Discharging 20 feet container ex barge empty |
|
|
|
|
Discharging 30 feet container ex barge empty |
|
|
|
|
Discharging 35 feet container ex barge empty |
|
|
|
|
Discharging 40 feet container ex barge empty |
|
|
|
|
Discharging containers with chains ex barge |
|
|
|
|
Discharging palletized cargo up to and including 3 cbm per 1000 kg |
|
|
|
|
Discharging palletized cargo - increase for exceeding 3 cbm per 1000 kg |
|
|
|
|
Discharging big bags of at least 1000 kg, provided with hoisting loops |
|
|
|
|
Discharging plywood/veneer bundled/on skids/crated, min. 300 kg per package - from North America |
|
|
|
|
Discharging logs - receipt by arrangement |
|
|
|
|
Discharging cellulose/woodpulp in units of min. 4 bales to be lifted on steelstrips |
|
|
|
|
Discharging newsprint and other paper on reels of min. 1000 kg per reel |
|
|
|
|
Discharging linerboard on reels of min. 1500 kg per reel |
|
|
|
|
Discharging plywood/veneer in bundles/on skids/in crates of min. 300 kg per package |
|
|
|
|
Discharging plywood/veneer in bundles/on skids/in crates of min. 300 kg per package - from North America |
|
|
|
|
|
|
Discharging logs - from North America |
|
|
|
|
Discharging logs incl. delay & labour for measuring during discharge |
|
|
|
|
Discharging timber/lumber in bundles of min. 0.5 cbm |
|
|
|
|
Discharging timber/lumber in bundles of min. 0.5 cbm - receipt by arrangement |
|
|
|
|
Discharging timber/lumber in bundles of min. 0.5 cbm incl. storage |
|
|
|
|
Discharging timber/lumber in bundles of min. 0.5 cbm - from North-America |
|
|
|
|
Discharging timber/lumber in bundles of min. 0.5 cbm from North-America - receipt by arrangement |
|
|
|
|
Discharging timber/lumber in bundles of min. 0.5 cbm from North-America incl. storage |
|
|
|
|
Discharging wallboards (like hardboard) on pallets/skids in bundles |
|
|
|
|
Discharging blooms up to/incl 5000 kg per piece/bundle |
|
|
|
|
Discharging blooms over 5000 kg per piece/bundle |
|
|
|
|
Discharging slabs up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Discharging slabs over 5000 kg per piece/bundle |
|
|
|
|
Discharging billets up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Discharging billets over 5000 kg per piece/bundle |
|
|
|
|
Discharging coils up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Discharging coils over 5000 kg per piece/bundle |
|
|
|
|
Discharging strips and hoops up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Discharging strips and hoops over 5000 kg per piece/bundle |
|
|
|
|
Discharging plates (also corrugated), up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Discharging plates (also corrugated), over 5000 kg per piece/bundle |
|
|
|
|
Discharging tinplates and sheets up to/incl. 5000 kg per piece/bundle |
|
|
|
|
Discharging tinplates and sheets over 5000 kg per piece/bundle |
|
|
|
|
|
|
Discharging pipes, loose or in bundles, over 3000 kg |
|
|
|
|
Discharging wire coils, unitized, over 1200 kg |
|
|
|
|
Discharging normal structural- and merchant steel up to/incl 12 metres in length |
|
|
|
|
Discharging normal structural- and merchant steel longer than 12 metres |
|
|
|
|
Discharging other iron and steel of min. 500 kg per piece/bundle |
|
|
|
|
Discharging ingots of min. 25 kg each |
|
|
|
|
Discharging blocks of min. 25 kg each |
|
|
|
|
Discharging plates of min. 25 kg each |
|
|
|
|
Discharging bars of min. 25 kg each |
|
|
|
|
Discharging slabs of min. 25 kg each |
|
|
|
|
Discharging units of min. 950 kg |
|
|
|
|
Discharging bundles of min. 950 kg |
|
|
|
|
Discharging blocks of min. 950 kg |
|
|
|
|
Discharging ferro chrome in cases of min. 500 kg |
|
|
|
|
Discharging cadmium in cases of min. 500 kg |
|
|
|
|
Discharging bismut in cases of min. 500 kg |
|
|
|
|
Discharging other non ferrous metals in cases of min. 500 kg |
|
|
|
|
Discharging fresh fruits up to/incl. 10 kg per package |
|
|
|
|
Discharging fresh fruits over 10 kg, up to/incl. 15 kg per package |
|
|
|
|
Discharging fresh fruits over 15 kg per package |
|
|
|
|
Discharging fresh fruits palletized, up to/incl 750 kg per pallet or in bins of min. 400 kg |
|
|
|
|
Discharging fresh fruits palletized, over 750 kg per pallet |
|
|
|
|
Discharging other agricultural products, up to/incl 15 kg per package |
|
|
|
|
Discharging other agricultural products, over 15 kg up to/incl. 45 kg per package |
|
|
|
|
Discharging other agricultural products, over 45 kg per package |
|
|
|
|
Discharging cooled/refrig. cargo other than meat, up to/incl 20 kg per package |
|
|
|
|
Discharging cooled and refrig. cargo other than meat, up to/incl. 20 kg per package, incl. extra for weighing |
|
|
|
|
Discharging cooled and refrig. cargo other than meat, over 20 kg per package |
|
|
|
|
Discharging cooled and refrig. cargo other than meat, over 20 kg per package, incl. weighing on deck |
|
|
|
|
Discharging cooled and refrig. cargo other than meat, palletized |
|
|
|
|
Discharging frozen meat, unpacked or in bags, up to/incl. 20 kg per package |
|
|
|
|
Discharging frozen meat, unpacked or in bags, over 20 kg but up to/incl 45 kg per package |
|
|
|
|
Discharging frozen meat, unpacked or in bags, over 45 kg per package |
|
|
|
|
Discharging chilled meat, unpacked or in bags, up to/incl. 20 kg per package |
|
|
|
|
Discharging chilled meat, unpacked or in bags, over 20 kg but up to/incl. 45 kg per package |
|
|
|
|
Discharging chilled meat, unpacked or in bags, over 45 kg per package |
|
|
|
|
Discharging fruit juices in drums of min. 160 kg |
|
|
|
|
Discharging fruit juices in drums of min. 160 kg, not stowed in cool chamber |
|
|
|
|
Discharging capoc in bales |
|
|
|
|
Discharging cotton in bales |
|
|
|
|
Discharging cottonwaste in bales |
|
|
|
|
Discharging hemp in bales |
|
|
|
|
Discharging jute in bales |
|
|
|
|
Discharging sisal in bales |
|
|
|
|
Discharging wool in bales |
|
|
|
|
Discharging bagged cargo, min.40 kg per bag vide alphabetic list group A |
|
|
|
|
Discharging bagged cargo, min. 40 kg per bag vide alphabetic list group B |
|
|
|
|
Discharging cocoa, expellers in bags of min. 50 kg |
|
|
|
|
|
|
Discharging drums and barrels of min. 160 kg, to be handled with chimbhooks |
|
|
|
|
Discharging drums and barrels of at least 160 kg to be handled without chimbhooks or limited hoist size due to IMO class |
|
|
|
|
Discharging general cargo, measuring up to/incl 3 cbm per 1000 kg |
|
|
|
|
Discharging general cargo, extra for measuring over 3 cbm per 1000 kg |
|
|
|
|
Discharging motorcars or other rolling stock unpacked with tyres or tracks, up to/incl. 5 tons per piece |
|
|
|
|
Discharging motorcars or other rolling stock unpacked with tyres or tracks, over 5 tons but up to/incl. 17.5 tons per piece |
|
|
|
|
Discharging motorcars or other rolling stock unpacked with tyres or tracks, over 17.5 tons per piece |
|
|
|
|
Discharging granite and marble in blocks of min. 2000 kg |
|
|
|
|
|
|
|
|
Discharging ore or other minerals by grab |
|
|
|
|
Discharging copra or -pallets by grab |
|
|
|
|
Discharging palmkernels by grab |
|
|
|
|
|
|
Discharging copra by elevator, incl. weighing |
|
|
|
|
Discharging groundnuts (decorticated) by elevator, incl. weighing |
|
|
|
|
Discharging palmkernels by elevator incl. weighing |
|
|
|
|
Discharging containers/flats up to/incl. 50 pieces per call |
|
|
|
|
Discharging containers/flats over 50 pieces per call |
|
|
|
|
Discharging containers DeepSea/ShortSea in overtime |
|
|
|
|
Discharging containers with chains DeepSea/ShortSea in overtime |
|
|
|
|
Discharging adapters in overtime |
|
|
|
|
Discharging palletized cargo in overtime |
|
|
|
|
Discharging unpacked lifts in overtime |
|
|
|
|
Discharging uncontainerized cargo in overtime |
|
|
|
|
Discharging containers feeders in overtime |
|
|
|
|
Discharging containers with chains feeders in overtime |
|
|
|
|
Discharging chassis in overtime |
|
|
|
|
Discharging breakbulk (1 ton to 7 ton) ro-ro in overtime |
|
|
|
|
Discharging breakbulk (<1 ton) ro-ro in overtime |
|
|
|
|
Discharging cars (not selfdriven) ro-ro |
|
|
|
|
Discharging cars (not selfdriven) ro-ro in overtime |
|
|
|
|
Discharging cars (selfdriven) ro-ro |
|
|
|
|
Discharging cars (selfdriven) ro-ro in overtime |
|
|
|
|
Discharging containers on wheels ro-ro |
|
|
|
|
Discharging containers on wheels ro-ro in overtime |
|
|
|
|
Discharging general cargo (1 ton to 7 tons) ro-ro |
|
|
|
|
Discharging general cargo (<1 ton) ro-ro |
|
|
|
|
Discharging logs (bundled) ro-ro |
|
|
|
|
Discharging logs (bundled) ro-ro in overtime |
|
|
|
|
Discharging logs (loose) ro-ro |
|
|
|
|
Discharging logs (loose) ro-ro in overtime |
|
|
|
|
Discharging special units ro-ro |
|
|
|
|
Discharging special units ro-ro in overtime |
|
|
|
|
Discharging tractors (not selfdriven) ro-ro |
|
|
|
|
Discharging tractors (not selfdriven) ro-ro in overtime |
|
|
|
|
Discharging tractors (selfdriven) ro-ro |
|
|
|
|
Discharging tractors (selfdriven) ro-ro in overtime |
|
|
|
|
Discharging trailers ro-ro |
|
|
|
|
Discharging trailers ro-ro in overtime |
|
|
|
|
Discharging trucks (not selfdriven) ro-ro |
|
|
|
|
Discharging trucks (not selfdriven) ro-ro in overtime |
|
|
|
|
Discharging trucks (selfdriven) ro-ro |
|
|
|
|
Discharging trucks (selfdriven) ro-ro in overtime |
|
|
|
|
Discharging units on wheels (selfdriven) ro-ro |
|
|
|
|
Discharging units on wheels (selfdriven) ro-ro in overtime |
|
|
|
|
Discharging costs incl. loading on truck/wagon |
|
|
|
|
|
|
|
|
|
|
Discharging 20 feet container full ex barge - additional charges |
|
|
|
|
Discharging 20 feet container full ex barge with overheight/overwide |
|
|
|
|
Discharging 40 feet container full ex barge - additional charges |
|
|
|
|
Discharging 40 feet container full ex barge with overheight/overwide |
|
|
|
|
Discharging 20 feet container empty ex barge - additional charges |
|
|
|
|
Discharging 40 feet container empty ex barge - additional charges |
|
|
|
|
Discharging 20 feet container full DS/SS with dangerous goods |
|
|
|
|
Discharging 20 feet container full DS/SS with overheight/overwide |
|
|
|
|
Discharging 20 feet container full DS/SS with flats/platform |
|
|
|
|
Discharging 40 feet container full DS/SS with dangerous goods |
|
|
|
|
Discharging 40 feet container full DS/SS with overheight/overwide |
|
|
|
|
Discharging 40 feet container full DS/SS with flats/platform |
|
|
|
|
Discharging 20 feet container full DS/SS with overheight/overwide ex feeders |
|
|
|
|
Discharging 20 feet container full DS/SS with dangerous goods ex feeders |
|
|
|
|
Discharging 40 feet container full DS/SS with overheight/overwide ex feeders |
|
|
|
|
Discharging 40 feet container full DS/SS with dangerous goods ex feeders |
|
|
|
|
Discharging 45 feet container full DS/SS |
|
|
|
|
Discharging 45 feet container empty DS/SS |
|
|
|
|
Discharging 45 feet containers full ex feeders |
|
|
|
|
Discharging 45 feet container empty ex feeders |
|
|
|
|
Discharging 45 feet container ex barge full |
|
|
|
|
Discharging 45 feet container ex barge empty |
|
|
|
|
Discharging 45 feet container full ex barge - additional charges |
|
|
|
|
Discharging 45 feet container full ex barge with overheight/overwide |
|
|
|
|
Discharging 45 feet container empty ex barge - additional charges |
|
|
|
|
Discharging 45 feet container full DS/SS with dangerous goods |
|
|
|
|
Discharging 45 feet container full DS/SS with overheight/overwide |
|
|
|
|
Discharging 45 feet container full DS/SS with flats/platform |
|
|
|
|
Discharging 45 feet container full DS/SS with overheight/overwide ex feeders |
|
|
|
|
Discharging 45 feet container full DS/SS with dangerous goods ex feeders |
|
|
|
|
Discharging uncontainerized cargo |
|
|
|
|
Discharging uncontainerized cargo in overtime |
|
|
|
|
|
|
|
|
Shifting containers on time-basis |
|
|
|
|
Shifting containers with chains |
|
|
|
|
|
|
Shifting palletized cargo |
|
|
|
|
Shifting palletized cargo on time-basis |
|
|
|
|
|
|
Shifting unpacked lifts on time-basis |
|
|
|
|
Shifting uncontainerized cargo |
|
|
|
|
Shifting containers in barge |
|
|
|
|
Shifting containers on time-basis on barge |
|
|
|
|
Shifting containers with chains on barge |
|
|
|
|
Shifting containers in overtime |
|
|
|
|
Shifting adapters in overtime |
|
|
|
|
Shifting containers with chains in overtime |
|
|
|
|
Shifting unpacked lifts in overtime |
|
|
|
|
Shifting unpacked lifts on time-basis in overtime |
|
|
|
|
Shifting uncontainerized cargo in overtime |
|
|
|
|
Shifting breakbulk (1 ton to 7 ton) ro-ro |
|
|
|
|
Shifting breakbulk (1 ton to 7 ton) ro-ro in overtime |
|
|
|
|
Shifting breakbulk (<1 ton) ro-ro |
|
|
|
|
Shifting breakbulk (<1 ton) ro-ro in overtime |
|
|
|
|
Shifting cars (not selfdriven) ro-ro |
|
|
|
|
Shifting cars (not selfdriven) ro-ro in overtime |
|
|
|
|
Shifting cars (selfdriven) ro-ro |
|
|
|
|
Shifting cars (selfdriven) ro-ro in overtime |
|
|
|
|
Shifting containers on wheels ro-ro |
|
|
|
|
Shifting containers on wheels ro-ro in overtime |
|
|
|
|
Shifting special units ro-ro |
|
|
|
|
Shifting special units ro-ro in overtime |
|
|
|
|
Shifting tractors (not selfdriven) ro-ro |
|
|
|
|
Shifting tractors (not selfdriven) ro-ro in overtime |
|
|
|
|
Shifting tractors (selfdriven) ro-ro |
|
|
|
|
Shifting tractors (selfdriven) ro-ro in overtime |
|
|
|
|
|
|
Shifting trailers ro-ro in overtime |
|
|
|
|
Shifting trucks (not selfdriven) ro-ro |
|
|
|
|
Shifting trucks (not selfdriven) ro-ro in overtime |
|
|
|
|
Shifting trucks (selfdriven) ro-ro |
|
|
|
|
Shifting trucks (selfdriven) ro-ro in overtime |
|
|
|
|
Shifting units on wheels (selfdriven) ro-ro |
|
|
|
|
Shifting units on wheels (selfdriven) ro-ro in overtime |
|
|
|
|
Shifting 20 feet container full on board |
|
|
|
|
Shifting 40 feet container full on board |
|
|
|
|
Shifting 20 feet container empty on board |
|
|
|
|
Shifting 40 feet container empty on board |
|
|
|
|
Shifting 20 feet container full on board with overheight/overwide |
|
|
|
|
Shifting 40 feet container full on board with overheight/overwide |
|
|
|
|
Shifting 20 feet container full over quai |
|
|
|
|
Shifting 40 feet container full over quai |
|
|
|
|
Shifting 20 feet container empty over quai |
|
|
|
|
Shifting 40 feet container empty over quai |
|
|
|
|
Shifting 20 feet container full over quai with overheight/overwide |
|
|
|
|
Shifting 40 feet container full over quai with overheight/overwide |
|
|
|
|
Shifting 45 feet container full on board |
|
|
|
|
Shifting 45 feet container empty on board |
|
|
|
|
Shifting 45 feet container full on board with overheight/overwide |
|
|
|
|
Shifting 45 feet container full over quai |
|
|
|
|
Shifting 45 feet container empty over quai |
|
|
|
|
Shifting 45 feet container full over quai with overheight/overwide |
|
|
|
|
|
|
Reloading (incl. rectification) |
|
|
|
|
Reloading containers on time-basis |
|
|
|
|
Reloading containers with chains |
|
|
|
|
|
|
|
|
Reloading unpacked lifts on time-basis |
|
|
|
|
Reloading uncontainerised cargo |
|
|
|
|
Reloading containers into barge |
|
|
|
|
Reloading containers into barge on time-basis |
|
|
|
|
Reloading containers into barge with chains |
|
|
|
|
Reloading containers in overtime |
|
|
|
|
Reloading adapters in overtime |
|
|
|
|
Reloading containers with chains in overtime |
|
|
|
|
Reloading unpacked lifts in overtime |
|
|
|
|
Reloading unpacked lifts on time-basis in overtime |
|
|
|
|
Reloading uncontainerized cargo in overtime |
|
|
|
|
Reloading breakbulk (1 ton to 7 ton) ro-ro |
|
|
|
|
Reloading breakbulk (1 ton to 7 ton) ro-ro in overtime |
|
|
|
|
Reloading breakbulk (<1 ton) ro-ro |
|
|
|
|
Reloading breakbulk (<1 ton) ro-ro in overtime |
|
|
|
|
Reloading cars (not selfdriven) ro-ro |
|
|
|
|
Reloading cars (not selfdriven) ro-ro in overtime |
|
|
|
|
Reloading cars (selfdriven) ro-ro |
|
|
|
|
Reloading cars (selfdriven) ro-ro in overtime |
|
|
|
|
Reloading containers on wheels ro-ro |
|
|
|
|
Reloading containers on wheels ro-ro in overtime |
|
|
|
|
Reloading special units ro-ro |
|
|
|
|
Reloading special units ro-ro in overtime |
|
|
|
|
Reloading tractors (not selfdriven) ro-ro |
|
|
|
|
Reloading tractors (not selfdriven) ro-ro in overtime |
|
|
|
|
Reloading tractors (selfdriven) ro-ro |
|
|
|
|
Reloading tractors (selfdriven) ro-ro in overtime |
|
|
|
|
|
|
Reloading trailers ro-ro in overtime |
|
|
|
|
Reloading trucks (not selfdriven) ro-ro |
|
|
|
|
Reloading trucks (not selfdriven) ro-ro in overtime |
|
|
|
|
Reloading trucks (selfdriven) ro-ro |
|
|
|
|
Reloading trucks (selfdriven) ro-ro in overtime |
|
|
|
|
Reloading units on wheels (selfdriven) ro-ro |
|
|
|
|
Reloading units on wheels (selfdriven) ro-ro in overtime |
|
|
|
|
Reloading 20 feet container full via quai |
|
|
|
|
Reloading 40 feet container full via quai |
|
|
|
|
Reloading 45 feet container full via quai |
|
|
|
|
Reloading 20 feet container empty via quai |
|
|
|
|
Reloading 40 feet container empty via quai |
|
|
|
|
Reloading 45 feet container empty via quai |
|
|
|
|
Reloading 20 feet container full via quai with overheight/overwide |
|
|
|
|
Reloading 40 feet container full via quai with overheight/overwide |
|
|
|
|
Reloading 45 feet container full via quai with overheight/overwide |
|
|
|
|
|
|
Receiving by rail of empty chassis |
|
|
|
|
Receiving by road of empty chassis |
|
|
|
|
Receiving container via rail empty |
|
|
|
|
Receiving container via rail empty bundled |
|
|
|
|
Receiving container via rail full |
|
|
|
|
Receiving container via rail not shipbound empty |
|
|
|
|
Receiving container via rail not shipbound empty bundled |
|
|
|
|
Receiving container via rail not shipbound full |
|
|
|
|
Receiving container via road empty |
|
|
|
|
Receiving container via road full |
|
|
|
|
Receiving container via road not shipbound empty |
|
|
|
|
Receiving container via road not shipbound empty bundled |
|
|
|
|
Receiving container via road not shipbound empty bundled |
|
|
|
|
Receiving container via road not shipbound full |
|
|
|
|
Receiving containers with chains |
|
|
|
|
|
|
|
|
|
|
|
|
Receiving selfunits (<10 ton) |
|
|
|
|
Receiving selfunits assisted by third party |
|
|
|
|
Receiving selfunits on time-basis |
|
|
|
|
|
|
Receiving uncontainerized cargo |
|
|
|
|
Receiving uncontainerized cargo (tariff per hour) |
|
|
|
|
Receiving uncontainerized cargo (tariff per piece) |
|
|
|
|
Receiving units on wheels |
|
|
|
|
Receiving units on wheels on time-basis |
|
|
|
|
|
|
Receipt control and storage |
|
|
|
|
Receipt controll on damage and tally |
|
|
|
|
Receipt ex seashed and loading on vehicle |
|
|
|
|
Receipt ex seashed till stored for normal storage |
|
|
|
|
Receipt ex seashed till stored for terminal market |
|
|
|
|
Receiving costs into shed |
|
|
|
|
Receipt ex vessel, tally, till stored for normal storage |
|
|
|
|
Receipt ex vessel, tally, till stored for terminal market |
|
|
|
|
Receiving 20 feet container full |
|
|
|
|
Receiving 40 feet container full |
|
|
|
|
Receiving 20 feet container full with overheight/overwide - additional |
|
|
|
|
Receiving 40 feet container full with overheight/overwide - additional |
|
|
|
|
Receiving 20 feet container empty |
|
|
|
|
Receiving 40 feet container empty |
|
|
|
|
Receiving 45 feet container full |
|
|
|
|
Receiving 45 feet container full with overheight/overwide - additional |
|
|
|
|
Receiving 45 feet container empty |
|
|
|
|
Receiving/delivering by road in overtime |
|
|
|
|
Receiving/delivering by rail in overtime |
|
|
|
|
Receiving/delivering by barge in overtime |
|
|
|
|
Receiving/delivering by shortsea in overtime |
|
|
|
|
Receiving/delivering by feeder in overtime |
|
|
|
|
Received/delivered by road not shipbound full |
|
|
|
|
Received/delivered by road not shipbound empty |
|
|
|
|
Received/delivered by rail not shipbound full |
|
|
|
|
Received/delivered by rail not shipbound empty |
|
|
|
|
Received/delivered by barge not shipbound full |
|
|
|
|
Received/delivered by barge not shipbound empty |
|
|
|
|
Receiving more than one month at terminal |
|
|
|
|
|
|
Delivering by rail of empty chassis |
|
|
|
|
Delivering by road of empty chassis |
|
|
|
|
Delivering container via rail empty |
|
|
|
|
Delivering container via rail empty bundled |
|
|
|
|
Delivering container via rail full |
|
|
|
|
Delivering container via rail not shipbound empty |
|
|
|
|
Delivering container via rail not shipbound empty bundled |
|
|
|
|
Delivering container via rail not shipbound full |
|
|
|
|
Delivering container via road empty |
|
|
|
|
Delivering container via road empty bundled |
|
|
|
|
Delivering container via road full |
|
|
|
|
Delivering container via road not shipbound empty |
|
|
|
|
Delivering container via road not shipbound empty bundled |
|
|
|
|
Delivering container via road not shipbound full |
|
|
|
|
Delivering containers with chains |
|
|
|
|
Delivering generator-sets |
|
|
|
|
|
|
|
|
|
|
Delivering selfunits assisted by third party |
|
|
|
|
Delivering selfunits on time-basis |
|
|
|
|
|
|
Delivering uncontainerized cargo |
|
|
|
|
Delivering uncontainerized cargo (tariff per hour) |
|
|
|
|
Delivering uncontainerized cargo (tariff per piece) |
|
|
|
|
Delivering units on wheels |
|
|
|
|
Delivering units on wheels on time-basis |
|
|
|
|
Delivering unpacked lifts |
|
|
|
|
|
|
|
|
|
|
|
|
Delivery into store (Store, warehouse, Customs area, transit store) |
|
|
|
|
Delivery in the customs depot |
|
|
|
|
Delivery into store, warehouse, dustoms depot, T.I.R. depot |
|
|
|
|
|
|
Redelivery ex warehouse into/onto means of transport |
|
|
|
|
Delivery 20 feet container full |
|
|
|
|
Delivery 40 feet container full |
|
|
|
|
Delivery 20 feet container full with overheight/overwide |
|
|
|
|
Delivery 40 feet container full with overheight/overwide |
|
|
|
|
Delivery 20 feet container full with overheight/overwide - additional |
|
|
|
|
Delivery 40 feet container full with overheight/overwide - additional |
|
|
|
|
Delivery 20 feet container empty |
|
|
|
|
Delivery 40 feet container empty |
|
|
|
|
Redelivery out of store empty |
|
|
|
|
Delivery 45 feet container full |
|
|
|
|
Delivery 45 feet container full with overheight/overwide |
|
|
|
|
Delivery 45 feet container full with overheight/overwide - additional |
|
|
|
|
Delivery 45 feet container empty |
|
|
|
|
TERMINAL ACTIVITIES CHARGES |
|
|
|
|
Attaching/detaching clip-on units |
|
|
|
|
|
|
|
|
|
|
Containers-moves with chains export |
|
|
|
|
Containers-moves with chains import |
|
|
|
|
|
|
Extra handling on time-basis |
|
|
|
|
Internal transport and (un)-stacking of containers export |
|
|
|
|
Internal transport and (un)-stacking of containers import |
|
|
|
|
Opening doors of containers |
|
|
|
|
Pretrip transport of coolcontainers |
|
|
|
|
|
|
|
|
|
|
|
|
Terminal handling charge - loading |
|
|
|
|
Terminal handling charge - discharge |
|
|
|
|
Terminal handling charge - destination |
|
|
|
|
Terminal handling charge - origin |
|
|
|
|
Remove damaged twistlocks |
|
|
|
|
|
|
|
|
Storage 20 feet containers export |
|
|
|
|
Storage 30 feet containers export |
|
|
|
|
Storage 35 feet containers export |
|
|
|
|
Storage 40 feet containers export |
|
|
|
|
Storage 20 feet containers not shipbound |
|
|
|
|
Storage 30 feet containers not shipbound |
|
|
|
|
Storage 35 feet containers not shipbound |
|
|
|
|
Storage 40 feet containers not shipbound |
|
|
|
|
Storage 20 feet containers import |
|
|
|
|
Storage 30 feet containers import |
|
|
|
|
Storage 35 feet containers import |
|
|
|
|
Storage 40 feet containers import |
|
|
|
|
Storage 20 feet empty container |
|
|
|
|
Storage 30 feet empty container |
|
|
|
|
Storage 35 feet empty container |
|
|
|
|
Storage 40 feet empty container |
|
|
|
|
Storage 20 feet empty reefer container |
|
|
|
|
Storage 30 feet empty reefer container |
|
|
|
|
Storage 35 feet empty reefer container |
|
|
|
|
Storage 40 feet empty reefer container |
|
|
|
|
Storage 20 feet empty container export |
|
|
|
|
Storage 30 feet empty container export |
|
|
|
|
Storage 35 feet empty container export |
|
|
|
|
Storage 40 feet empty container export |
|
|
|
|
Storage 20 feet empty container import |
|
|
|
|
Storage 30 feet empty container import |
|
|
|
|
Storage 35 feet empty container import |
|
|
|
|
Storage 40 feet empty container import |
|
|
|
|
Storage 20 feet empty container export not shipbound delivered |
|
|
|
|
Storage 30 feet empty container export not shipbound delivered |
|
|
|
|
Storage 35 feet empty container export not shipbound delivered |
|
|
|
|
Storage 40 feet empty container export not shipbound delivered |
|
|
|
|
|
|
|
|
|
|
Storage of units on wheels |
|
|
|
|
Storage of unpacked lifts |
|
|
|
|
Storage of general cargo per ton per day |
|
|
|
|
Storage of general cargo per unit per day |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Storage dues for special container empty |
|
|
|
|
Storage dues for special container empty |
|
|
|
|
Storage dues for 20 feet container empty |
|
|
|
|
Storage dues for 40 feet container empty |
|
|
|
|
Storage dues - additional charges |
|
|
|
|
Storage dues for over x times cargo measurement |
|
|
|
|
Storage 45 feet containers export |
|
|
|
|
Storage 45 feet containers not shipbound |
|
|
|
|
Storage 45 feet containers import |
|
|
|
|
Storage 45 feet empty container |
|
|
|
|
Storage 45 feet empty reefer container |
|
|
|
|
Storage 45 feet empty container export |
|
|
|
|
Storage 45 feet empty container import |
|
|
|
|
Storage 45 feet empty container export not shipbound delivered |
|
|
|
|
Storage dues for 45 feet container empty |
|
|
|
|
Storage full more than one month at terminal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tug master drivers per hour |
|
|
|
|
Forktruck drivers per hour |
|
|
|
|
|
|
|
|
Van carrier drivers per hour |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Terminal labour in overtime |
|
|
|
|
|
|
Shed operators in overtime |
|
|
|
|
Tug master drivers in overtime |
|
|
|
|
Fork truck drivers in overtime |
|
|
|
|
|
|
Traffic leaders in overtime |
|
|
|
|
Van carrier drivers in overtime |
|
|
|
|
Crane drivers in overtime |
|
|
|
|
Technical men in overtime |
|
|
|
|
|
|
|
|
|
|
Maintenance men in overtime |
|
|
|
|
Lashing in containers on board |
|
|
|
|
Additional charge for containerlashing on board |
|
|
|
|
Lashing in container on special shift |
|
|
|
|
Receiving 20 feet container empty - additional charges |
|
|
|
|
Receiving 40 feet container empty - additional charges |
|
|
|
|
Receiving 40 feet container full - additional charges |
|
|
|
|
Receiving 40 feet container full - additional charges |
|
|
|
|
Delivering 20 feet container empty - additional charges |
|
|
|
|
Delivering 40 feet container empty - additional charges |
|
|
|
|
Delivering 20 feet container full - additional charges |
|
|
|
|
Delivering 40 feet container full - additional charges |
|
|
|
|
Receiving 45 feet container empty - additional charges |
|
|
|
|
Receiving 45 feet container full - additional charges |
|
|
|
|
Receiving 45 feet container full - additional charges |
|
|
|
|
Delivering 45 feet container empty - additional charges |
|
|
|
|
Delivering 45 feet container full - additional charges |
|
|
|
|
|
|
Labelling, repacking and allied services (FF) |
|
|
|
|
Marking / labelling / removing marks or labels |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assistance during sampling and/or survey |
|
|
|
|
|
|
Charges for splitting and sorting consignments |
|
|
|
|
|
|
|
|
Packing, repacking, marking |
|
|
|
|
Palletizing, including pallets |
|
|
|
|
|
|
|
|
Packaging (handling, etc.) (40) |
|
|
|
|
|
|
Weigh / mark / labour charges |
|
|
|
|
|
|
Weighing - superintending costs |
|
|
|
|
|
|
|
|
Weighing (charge for) (20) |
|
|
|
|
|
|
|
|
|
|
Public weighbridge charges (FF) |
|
|
|
|
Rehandling of empty containers for weighing |
|
|
|
|
Weighing container-vehicle |
|
|
|
|
|
|
|
|
MISCELLANEOUS HANDLING CHARGES |
|
|
|
|
Atmosphere/temperature suppl.fee |
|
|
|
|
Consolidated container allowance |
|
|
|
|
Container - delivery charges |
|
|
|
|
|
|
Costs of official delivery into customs depot |
|
|
|
|
|
|
Handling of hatchcovers DeepSea/ShortSea |
|
|
|
|
Handling of hatchcovers feeder |
|
|
|
|
Handling of hatchcovers on time-basis DeepSea/ShortSea |
|
|
|
|
Handling of hatchcovers on time-basis Feeder |
|
|
|
|
Handling of hatchcovers with chains DeepSea/ShortSea |
|
|
|
|
Handling of hatchcovers with chains Feeder |
|
|
|
|
Handling of hatchcovers in overtime |
|
|
|
|
Handling of hatchcovers with chains in overtime |
|
|
|
|
|
|
|
|
Immobilization for loading and unloading (30) |
|
|
|
|
Immobilization in transit / at border / customs station (FF) |
|
|
|
|
Immobilization of stock other than waggons (charge for) (20) |
|
|
|
|
|
|
Movement within the port limits |
|
|
|
|
|
|
|
|
|
|
Private siding at destination station (charge for) |
|
|
|
|
Private siding at forwarding station (charge for) |
|
|
|
|
|
|
|
|
|
|
|
|
Securing, lashing and chocking, etc. of traffic, as necessary |
|
|
|
|
Share discharging costs arrangement |
|
|
|
|
|
|
Shunting at forwarding station (charge for) (20) |
|
|
|
|
|
|
|
|
|
|
Stripping and stuffing container |
|
|
|
|
Stripping container and handling in for storage |
|
|
|
|
Stripping ex vehicle till free on truck incl. 1 month warehouserent |
|
|
|
|
Stripping lighter and handling in for storage |
|
|
|
|
Stripping railcar and handling in for storage |
|
|
|
|
Stripping truck and handling in for storage |
|
|
|
|
Surface charge - destination |
|
|
|
|
|
|
Transport in custody of customs |
|
|
|
|
|
|
Shunting charge at destination station |
|
|
|
|
Charge for use of lifting equipment |
|
|
|
|
Extra move container full |
|
|
|
|
Extra move for inspection |
|
|
|
|
Extra move container empty |
|
|
|
|
|
|
|
|
Extra move for stripping - round trip |
|
|
|
|
Handling dues as per agreement |
|
|
|
|
|
|
|
|
Additional charges for heavy lifts |
|
|
|
|
Additional charges for over x times measurement of cargo lifts |
|
|
|
|
Stuffing 20 feet container |
|
|
|
|
Stuffing 40 feet container |
|
|
|
|
|
|
Partial stuffing of 20 feet container |
|
|
|
|
Partial stuffing of 40 feet container |
|
|
|
|
Weight dues for stripping and stuffing container |
|
|
|
|
Container partially stuffed over x times measurement |
|
|
|
|
Stuffing of 20 feet containers with passenger cars |
|
|
|
|
Stuffing of 40 feet containers with passenger cars |
|
|
|
|
Rehandling of partially stuffed containers |
|
|
|
|
|
|
Stripping 20 feet container |
|
|
|
|
Stripping 40 feet container |
|
|
|
|
Stuffing 45 feet container |
|
|
|
|
Partial stuffing of 45 feet container |
|
|
|
|
Stuffing of 45 feet containers with passenger cars |
|
|
|
|
Stripping 45 feet container |
|
|
|
|
|
|
|
|
|
|
|
|
Use of liquid proof floor, per day |
|
|
|
|
|
|
Extra movements for IMO 1/7 containers |
|
|
|
|
|
|
Trucking and unstacking/stacking of containers |
|
|
|
|
|
|
Extra handling charges for rolling tarpaulins |
|
|
|
|
Handling of automatic twistlocks |
|
|
|
|
|
|
All documentation charges |
|
|
|
|
TRADE DOCUMENTATION CHARGES |
|
|
|
|
Additional documentation charge |
|
|
|
|
Additional documentation charge (10) |
|
|
|
|
Other administrative formalities (charge for) (20) |
|
|
|
|
|
|
|
|
Administration fee (Rouen) |
|
|
|
|
Documentation/administration allowance (DD) |
|
|
|
|
Carrier charges for customs formalities |
|
|
|
|
|
|
|
|
Blank certificates of origin |
|
|
|
|
|
|
|
|
Certified weight ticket (issued by sworn weighers) |
|
|
|
|
|
|
|
|
Postage and telephone (30) |
|
|
|
|
Telex, telephone, telefax, postage costs (DD) |
|
|
|
|
Telex, telephone, telegrams, correspondence, photo-copy charges (FF) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Consular charges - preparing printed forms |
|
|
|
|
Container administration fee |
|
|
|
|
Copies of customs documents |
|
|
|
|
Cost of accompanying documents |
|
|
|
|
Export documents (making out and/or presentation) |
|
|
|
|
|
|
|
|
Issuing non-manipulation certificate |
|
|
|
|
Issuing certificate of origin |
|
|
|
|
Issuing inspection certificate |
|
|
|
|
Issuing invoice on your letterheaded paper |
|
|
|
|
|
|
|
|
Issuing/splitting EUR-certificate |
|
|
|
|
LCL container administration fee |
|
|
|
|
Legalization charges (FF) |
|
|
|
|
|
|
|
|
|
|
Other documentary charges |
|
|
|
|
Preparing CCA (Charges Collect Advice) |
|
|
|
|
|
|
Preparing and/or presentation of certificate of origin |
|
|
|
|
Preparing and/or presentation of export certificate |
|
|
|
|
Preparing and/or presentation of take over/acceptance certificate |
|
|
|
|
Preparing certificates of origin |
|
|
|
|
Preparing consular invoices |
|
|
|
|
Preparing copies of customs documents |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Charges for the presentation of customs documents completion of a D.A.S. |
|
|
|
|
Customs clearance charges (Form DV1) (DD) |
|
|
|
|
Customs documentation costs (10) |
|
|
|
|
|
|
|
|
Customs formalities (charge for) (20) |
|
|
|
|
Preparing EUR/ATR certificate of origin |
|
|
|
|
Clearance and handling - destination |
|
|
|
|
Clearance and handling - origin |
|
|
|
|
Customs certification charge |
|
|
|
|
Customs examination charges |
|
|
|
|
Customs Inspection beside opening hours |
|
|
|
|
|
|
|
|
EEC certificate attendance |
|
|
|
|
|
|
Impos. of Taxes on Agricultural Products |
|
|
|
|
Issuing/splitting Int. Cocoa or Coffee Certificate |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T.V.A. transport sur parcours francais |
|
|
|
|
Transit customs declaration |
|
|
|
|
|
|
Customs clearing agent - Fees |
|
|
|
|
Costs of customs formalities in other countries |
|
|
|
|
Charge for customs formalities in the departure country |
|
|
|
|
Charge for customs formalities in the transit countries |
|
|
|
|
Charge for customs formalities in the arrival country |
|
|
|
|
|
|
Preparing L/C (Letter of Credit) |
|
|
|
|
TRANSPORT DOCUMENTATION CHARGES |
|
|
|
|
|
|
Advice of arrival (charge for) |
|
|
|
|
Advice of delivery (charge for) |
|
|
|
|
|
|
Preparing airwaybill (FF) |
|
|
|
|
Preparing Bills of Lading (10) |
|
|
|
|
|
|
Preparing international transport document |
|
|
|
|
Bill of Lading transfer charge |
|
|
|
|
|
|
Issuing transport-document |
|
|
|
|
|
|
|
|
Preparing and attendance for a request for import license |
|
|
|
|
Preparing delivery-orders |
|
|
|
|
|
|
|
|
|
|
Cost of (computerized) customs clearance (FF) |
|
|
|
|
|
|
|
|
TRANSPORT EQUIPMENT CHARGES |
|
|
|
|
All transport equipment charges |
|
|
|
|
|
|
|
|
Container detention charges |
|
|
|
|
|
|
|
|
Empty equipment handover charge |
|
|
|
|
Special equipment (cool/deeploaders) |
|
|
|
|
Use of Wagon-carrying Trailer (charge for) |
|
|
|
|
|
|
Charge for immobilising of equipment other than wagons |
|
|
|
|
Charge for using a wagon-carrying trailer on departure |
|
|
|
|
Charge for using a wagon-carrying trailer on arrival |
|
|
|
|
TRANSPORT ACCESSORIES RENT |
|
|
|
|
|
|
|
|
|
|
Trailer detention charges |
|
|
|
|
|
|
Charge for using heating equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Customs duties and other sums collected by customs other than VAT (20) |
|
|
|
|
|
|
|
|
|
|
|
|
Customs fines for account of principal (FF) |
|
|
|
|
Duties, taxes or excise (10) |
|
|
|
|
Restitution of Import Duties |
|
|
|
|
Suppl.Payment import duties |
|
|
|
|
|
|
|
|
|
|
Taxes, Excise or Excise Duties (FF) |
|
|
|
|
|
|
E.U.S.T.(Value of goods + duty) |
|
|
|
|
|
|
Value added tax (VAT) collected by customs (20) |
|
|
|
|
|
|
|
|
|
|
Turnover tax (E.U.S.T.) on services for account of Consignor |
|
|
|
|
Turnover tax (E.U.S.T.) on transport charges in transit through France (in cases where this is paid to a third Union (EU) |
|
|
|
|
|
|
|
|
Cleaning or disinfection charge |
|
|
|
|
All miscellaneous charges |
|
|
|
|
TRANSPORT INSURANCE CHARGES |
|
|
|
|
Insurance - insured capital |
|
|
|
|
Insurance - insured risks |
|
|
|
|
|
|
|
|
|
|
Insurance or declaration of value (charge for) (20) |
|
|
|
|
|
|
Insurance on goods in bonded warehouse |
|
|
|
|
Insurance on goods in bonded warehouse - fire |
|
|
|
|
Insurance on goods in bonded warehouse - other risks |
|
|
|
|
|
|
WAREHOUSE INSURANCE CHARGES |
|
|
|
|
Warehouse insurance - fire |
|
|
|
|
Warehouse insurance - other risks |
|
|
|
|
Warehouse insurance charges |
|
|
|
|
|
|
|
|
Warehouse rent on goods which have remained in the transit area over the allotted free period |
|
|
|
|
Warehouse rent per cbm per month or part thereof |
|
|
|
|
Warehouse rent per cbm per week or part thereof |
|
|
|
|
Warehouse rent per month or part thereof |
|
|
|
|
Warehouse rent per package per month or part thereof |
|
|
|
|
Warehouse rent per package per week or part thereof |
|
|
|
|
Warehouse rent per ton per month or part thereof |
|
|
|
|
Warehouse rent per ton per week or part thereof |
|
|
|
|
Warehouse rent per week or part thereof |
|
|
|
|
|
|
Customs warehouse rent (FF) |
|
|
|
|
|
|
|
|
Charges for the use of a bonded warehouse |
|
|
|
|
HANDLING ASSISTANCE TO CUSTOMS |
|
|
|
|
|
|
Presentation (to customs) and handling charges (FF) |
|
|
|
|
|
|
|
|
Equalization Tax (Dunkirk) |
|
|
|
|
|
|
Supervision during inspection/customs clearance |
|
|
|
|
Expenses declaration related to the value |
|
|
|
|
Expenses declaration related to the delivery |
|
|
|
|
|
|
Charges prepaid and paid on delivery (disbursement/charges forward) (FF) |
|
|
|
|
|
|
Shippers' disbursement (30) |
|
|
|
|
|
|
|
|
|
|
Advanced money commission (20) |
|
|
|
|
Advanced money commission (FF) |
|
|
|
|
Collection fee disbursement |
|
|
|
|
Cash on delivery (charge for) (20) |
|
|
|
|
Disbursement collection fee (10) |
|
|
|
|
Disbursement collection fee (30) |
|
|
|
|
Disbursement collection fee (40) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Care of animals (charge for) (20) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Charges chamber of commerce |
|
|
|
|
Charges for truck returning empty |
|
|
|
|
Charges resulting from the fact of having to wait for the consignor to supply documents needed for the completion of formalities required by Customs or other authorities (cf. article 25/paragraph 3(1) of CIM) |
|
|
|
|
Charges resulting from the fact that the consignor has entered in the consignment note particulars which are irregular/incorrect/incomplete or not in the alloted spaces (cf. article 18 of CIM) |
|
|
particulars which are irregular/incorrect/incomplete or not in the allotted spaces (cf. article 18 of CIM) |
|
|
|
|
|
|
Compensation for advance of credit to secure release of goods |
|
|
|
|
Compensation forwarding Amsterdam/Rotterdam |
|
|
|
|
Consignor - payment on delivery |
|
|
|
|
Consignor - payment on delivery (charges forward) |
|
|
|
|
Container handling charge |
|
|
|
|
Contradictory verification (charge for) |
|
|
|
|
|
|
Costs for guarantees undertaken |
|
|
|
|
Costs of services performed in other countries |
|
|
|
|
Counting or inspection of packages or animals (charge for) (20) |
|
|
|
|
|
|
Examination of goods before customs clearance (FF) |
|
|
|
|
Special supervision on cargo (charge for) |
|
|
|
|
Examination on the spot of a cargo of long articles (charge for) |
|
|
|
|
Examination on the spot of railway wagons on private bogies (charge for) |
|
|
|
|
Exceptional services performed, overtime |
|
|
|
|
|
|
FOB oceanport charges - all in |
|
|
|
|
Feeder addition discharging side |
|
|
|
|
|
|
|
|
Fees for presentation for veterinary and/or phyto-sanitary examination (FF) |
|
|
|
|
|
|
|
|
|
|
Financial charges on cash advanced, for guarantees undertaken or for international currency transfers (FF) |
|
|
|
|
For guarantees undertaken for export |
|
|
|
|
For guarantees undertaken for import |
|
|
|
|
For international currency transfers |
|
|
|
|
|
|
|
|
Freight forwarders' liability insurance |
|
|
|
|
From cif oceanport till free on truck, incl. 1 month warehouse rent |
|
|
|
|
From cif oceanport till stored in warehouse |
|
|
|
|
Guarantees and assay fees on precious metals |
|
|
|
|
Heli-charges survival suit |
|
|
|
|
Icing or re-icing (charge for) |
|
|
|
|
|
|
Inspection charges / phyto-sanitary dues (FF) |
|
|
|
|
Sanitary, veterinary, phyto-sanitary inspection (30) |
|
|
|
|
|
|
Interest in delivery (charge for) |
|
|
|
|
Change of axel (charge for) |
|
|
|
|
|
|
Local haulage to warehouse |
|
|
|
|
|
|
|
|
|
|
|
|
Miscellaneous - Due Agent |
|
|
|
|
Miscellaneous - Due Carrier |
|
|
|
|
Miscellaneous - Due Issuing Carrier |
|
|
|
|
Miscellaneous - Due Last Carrier |
|
|
|
|
Miscellaneous - Unassigned |
|
|
|
|
|
|
Other charges to be collected from the consignee |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Remit Following Collection Fee (FRC) |
|
|
|
|
|
|
|
|
|
|
|
|
Security and surveillance charges |
|
|
|
|
|
|
Shed/quay rent on goods which have remained in the transit area over the allotted free period |
|
|
|
|
|
|
|
|
Shipping stowage reduction |
|
|
|
|
|
|
|
|
Special commission rebate |
|
|
|
|
|
|
|
|
Sums collected by other administrative authorities |
|
|
|
|
Superintending charges on shipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Charges for reforwarding complete wagonloads emanating from or going to destination |
|
|
|
|
|
|
|
|
Other charges to be collected from consignee |
|
|
|
|
Cleaning or desinfection charge |
|
|
|
|
|
|
|
|
Supplementary charges for Sundays |
|
|
|
|
Supplementary charges for special shift |
|
|
|
|
|
|
Sweeping 20 feet container |
|
|
|
|
Sweeping 40 feet container |
|
|
|
|
Disposal of rubbish after sweeping |
|
|
|
|
Use of shed space for gasifying |
|
|
|
|
Accident procedures when dangerous goods |
|
|
|
|
Extras used in accident procedures when dangerous goods |
|
|
|
|
|
|
Sweeping 45 feet container |
|
|